Capital Development

Western Health is continuing its commitment to Melbourne’s Western Suburbs by making long-term capital plans for future growth.

The West requires approaches to health care infrastructure that are visionary, ambitious and enduring. These investments strengthen our ability to care for our rapidly growing, multicultural and socioeconomically diverse community.

Capital Development is strongly aligned with the Western Health Strategic Plan – in particular the Strategic Direction -we deliver services for the future.

Capital Development manage large number of infrastructure projects, from major new builds to smaller refurbishment projects, across all Western Health campuses and is responsible for project oversight, from inception through to commissioning and supporting occupancy.

  • Capital Development Overview

    Capital Development is a relatively small, professional team committed to driving the successful delivery of Western Health’s capital building works infrastructure portfolio.

    The division is currently going through an exciting period of growth in response to a large number of planned and funded infrastructure projects under development across the Western Health network of hospital sites.

     

    Capital Development provides a wide range of infrastructure project management activities including:

    • Oversight and liaison with Department of Health (DH) and Victorian Health Building Authority (VHBA) on Major Capital Development projects >$5M, including FF&E, and ICT deployments;
    • Oversight and project management of Capital Development Projects <$5M (External & Internally funded), including FF&E & ICT deployments;
    • Co-ordination and oversight of the Western Health Capital and Asset Management Plan (CAMP);
    • Co-ordination and oversight of Western Health Capital Infrastructure Grant Funding submissions
    • Co-ordination and oversight of the WH Service Planning & Capital Development Steering Committee.

     

    Capital Development provides a range of core information and capital related services including:

    • New and refurbishment project works, including feasibility studies and supporting funding applications
    • Capital & Asset Management oversight in conjunction with the Engineering and Digital and Technology Services Divisions
    • Monitoring & reporting of the Western Health Capital Works Program
    • Capital Development projects financial management & reporting
  • Current Projects

    New Hospitals

    New Footscray Hospital Construction of the new Footscray Hospital is set to be completed in 2025, replacing the existing 1950s built hospital. The new hospital will include more than 500 beds; acute facilities including an emergency department; specialist facilities including cardiovascular, operating theatres and procedural spaces, clinical support spaces; and teaching, training and research spaces. Robert Rothnie
    nfh@wh.org.au
    For more, visit New Footscray Hospital microsite.
    New Melton Hospital Construction of the new Melton Hospital will begin in 2024 and is set to open in 2029. The new hospital will include at least 274 beds, a 24-hour emergency department, ICU and services including maternity and neonatal services, mental health, radiology and outpatient care. Robert Rothnie
    nmh@wh.org.au
    For more, visit VHBA website.
    New Point Cook Hospital Construction of a new community hospital in Point Cook to provide increased access to health services. Corinna Christensen
    corinna.christensen@wh.org.au

     

    Capital (refurbishment and renovation) Projects

    Project Name Project Detail Contact Details
    Mental Health Expansion (52 beds) Construction of a new 52 bed adult acute mental health unit to provide increased capacity and support the existing SAAPU unit. Eamonn O’Donoghue eamonn.o’donoghue@wh.org.au
    Pharmacy Expansion Expansion of the existing main dispensing pharmacy to support growth and introduction of automatic dispensing and ascetic suite. Yvonne Eng
    yvonne.eng@wh.org.au
    SHMHE Ground Link way Creation of a new enclosed corridor providing seamless connection pathway from the ED and hospital to the new mental health building. Eamonn O’Donoghue
    eamonn.o’donoghue@wh.org.au
    Yanna Yanna PARC (Women’s Prevention & Recovery Care) Provision of a new 12 bed residential women’s and children’s prevention and recovery care centre. Eamonn O’Donoghue
    eamonn.o’donoghue@wh.org.au
    West Side Lodge Refurbishment Refurbishment of the current West Side Lodge Dual Diagnosis facility increasing the capacity by a further 10 beds and improving staff accommodation and consumer support areas. Yvonne Eng
    yvonne.eng@wh.org.au
    ASB Cladding Replacement – 3 stages Replacement of combustible cladding on the external walls of the ASB building. Elmer Posadas
    elmerjay.posadas@wh.org.au
    Emergency Department Refurb
    (Adult Acute)
    Refurbishment of the existing ED adult acute and old short stay areas, including reconfiguration of the staff base and old resus beds. Yvonne Eng
    yvonne.eng@wh.org.au
    Lift 19 Installation Installation of a new bed lift in Building A – Lift core no 19. Elmer Posadas
    elmerjay.posadas@wh.org.au
    SAAPU Refurb Internal refurbishment of SAAPU to address OH&S issues and support equity in care environment and service provisions with the new 52 bed unit. Corinna Christensen
    corinna.christensen@wh.org.au
    AMHRU Refurbishment Minor refresh to address safety concerns within the AMHRU facility. Dody Kurnianto
    Dody.Kurnianto@wh.org.au
    FH Infrastructure Upgrade – MH Sky Chiller Replacement Replacement of existing chillers (end of life) serving the mental health facilities. Elmer Posadas
    elmerjay.posadas@wh.org.au
    AOD Drug Health Services
    (Nicholson St)
    A refurbishment and building uplift will be completed to enhance the service capacity, service continuity and service efficiency. Yvonne Eng
    yvonne.eng@wh.org.au
    Bacchus Marsh – Major Electrical & Mechanical Upgrade Upgrade of the Electrical Main System (new Substation, Main switch room, Generators), installation of a new Cooling/ Heating plant and an upgrade of the Maternity HVAC system. Elmer Posadas
    elmerjay.posadas@wh.org.au
    Bacchus March – Grant Lodge Refurbishment Refurbishment of the current Grant Lodge Age care facility at Bacchus Marsh. Corinna Christensen
    corinna.christensen@wh.org.au
    Bacchus Marsh – Roof Replacement Works Replacement and retrofitting of existing roof in the Administration building, MSU and Urgent Care. Elmer Posadas
    elmerjay.posadas@wh.org.au
    Melton – Dental Heating & Cooling Upgrade Upgrade of the cooling/heating plant HVAC system. Elmer Posadas
    elmerjay.posadas@wh.org.au
    Hazeldean Refurbishment Refurbishment of Hazeldean Hospital to support a 10 bed NDIS service for patients requiring transitional care. Dody Kurnianto
    Dody.Kurnianto@wh.org.au
    CSSD Reverse Osmosis Water System (All Sites) Installation of an RO Water System to address compliance with AS4187 in CSSD areas at Sunshine, Sunbury and Williamstown Hospitals. Dody Kurnianto
    Dody.Kurnianto@wh.org.au
    SH & Sunbury DPU Refurbishment Refurbishment planning to support installation of new endoscopy washers and dryers. Elmer Posadas
    elmerjay.posadas@wh.org.au
    Sunbury Community Hospital Expansion of the existing hospital to accommodate Urgent Care Centre, Medical Imaging and increased day medical service capacity. Corinna Christensen
    corinna.christensen@wh.org.au
    Central Processing Kitchen Expansion planning for the production kitchen to address inherent operational flow issues and storage limitations to ensure capacity to support service provision. Corinna Christensen
    corinna.christensen@wh.org.au
    Ashley Street Office, Braybrook
    Fitout
    The new office fit out at Braybrook will create approx. 130 new desks across two office spaces. This will facilitate the relocation of non-clinical staff from FH to reduce the current office space pressures faced at WH. Uthpala Fernando
    uthpala.fernando@wh.org.au
     

Email: capitaldevelopment@wh.org.au
Phone: 8345 7828

Corinna Christensen
Director Capital Development